1946* Started Propriety Firm *Manufactured patented self priming pump |
1967 Private Ltd. Co.was incorporated |
1969 Supplied Vertical Axial Flow Raw Water Pumps to Badarpur Thermal Power |
1980 CW Pumps for Badarpur Thermal 210 MW,Unit-III FLOW 15000 CuM/Hr |
1982 CW Pumps for Ramagundam & Raichur Power Projects |
1985 CW Pumps for Unchahar Thermal |
1997 |
2000 Diversified into Total Turnkey Solution – Water Systems |
2006 Manufactured & installed 12 Vertical Pumps for Andhra Irrigation having total flow 224136 M³/Hr 18349.2 CuM/Hr @32.7 M 18349.2 CuM/Hr @45.08 M 11592 CuM/Hr @29.47 M |
2008 Public Ltd. Co. was incorporated |
2008 CW System Equipment Package NTPC Harduaganj (2x250MW) 18000M³ /Hr NTPC Bangaigaon (3x250MW) 16000M³/Hr |
2009 CW System Equipment Package NTPC Mouda (2x500 MW) 30000M³/Hr |
2010 Sea Water CW Pumps to Essar Power (13623 M³/Hr) |
2011 Installed India Largest Test Bed (Flow up to 70,000M3/Hr & motor rating up to 6000 KW in any voltage) |
2012 Rourkela Steel Plant ( SAIL). Awarded EPC package for Water Supply for New Plate Mill in collaboration with Bamag, Germany. |
2013 Secured Prestigious Contract from L&T (KBJNL) for Supply of 18 No V.T. Pump Sets for capacity(Flow 27637 M³/Hr at 36.5 Mtr. with 3775 KW/16 Pole HT Motor |
2013 Secured Prestigious Contract for Dilution Sea Water System for Bhavini Power |
2013 |
2014 Secured Prestigious CW System Equipment Package , NTPC Meja (2x660 MW) Flow 36000 CuM/Hr |
2014 Secured prestigious contract for Engineering, Supply, Erection and Commissioning of 2x150 MVA, 220/132 KV & 2x50 MVA, 132/33 KV Sub- Stations for JSEB, Jharkhand |
2014 Secured prestigious contract for Engineering, Supply, Erection and Commissioning of 33/11kV Sub-Stations and Associated Lines for Package-4 & 5 for OPTCL, Bhubaneswar, Orissa |
2014 Flowmore in collaboration with MWI-USA have launched a revolutionary product, solar Pedalflo |
2015 |
2017 |
2017 Secured prestigious contract for Fire Water Pump Package for Dangote Refinery |
2019 Secured prestigious CW System Pump set order for BPCL Kochi each 3200 M3/Hr at 66.5m |
|